The works on the new buildings of the Sanchaba school are progressing. The roof is on, the tiling has started. Soon the painting can start. The new classrooms should be ready by the start of the school year in September.

20210605 sanchaba01

20210605 sanchaba02 

Gidda Sukuta is a village in Kombo East with a growing population of 1500 inhabitants. Especially in the region adjacent to Giboroh Kuta there is a need for clean water.

The population helps to dig trenches for the laying of the water pipes through the village. We place a 7 m tower with water tank and 10 branch points.

At the inauguration, councilor Ousman Bah,  Pa Touray of the council of elders and Alkalo Saikou thanked Gammol and their sponsors.

Kairaba News Network: Gammol Delivers Water Facility To Gidda Sukuta Worth Of D700,000

20210412 giddasukuta0220210412 giddasukuta01

 

Nimisat is located in the north-eastern part of Sanyang. It is a densely populated area. The decentralized water system can be used by the medical aid station and the 3500 inhabitants.

20210321 Nimisat0120210321 Nimisat0320210321 Nimisat02

 

The Gambia does not escape covid-19 either. We send extra medical equipment and provide food for our local volunteers so that they can continue to work for wound care in the villages.

20210303 leetulor0220210303 leetulor01

 

After a long break due to corona and some urgent water projects, we are continuing to build the new school in Sanchaba. Four classrooms, a classroom for teachers and management and sanitary facilities. The works are progressing well. The masonry is finished and the metal roof trusses are ready to be installed.

20210125 sanchaba01

20210131 sanchaba0220210131 sanchaba01

 

Sanyang Garden is a municipal agricultural zone of more than 10 ha where the village grows vegetables.
There is no water because the two pumps are defective.

We replace one pump and repair the others. After 4 months there is water again!

20201222 SanyangGarden

 

Mandinary is a bit more to the north than Makumbaya. Here too, we will install a decentralized water system with a 7-meter tower, a 3000-liter tank and 10 taps.
With this installation we reach more than 2000 people

202012 mandinary02

202012 mandinary05202012 mandinary03202012 mandinary05

 

In Makumbaya, north-east of the airport, we are installing a new water supply with a 7 meter water tower, a 3000 liter water tank, 800 meters of pipes and 7 taps. Omar and Lamin have already placed some of these towers this year and know how to distribute the work well. People from the village come to help. Many hands make light work.

About 1500 people have now clean water.

.202011 makumbaya01;202011 makumbaya02

 

The pump of our water system in Jalambang is broken and needs to be replaced. That's fast, the pump was only installed in the spring.

The Gambian electricity supply is very irregular, causing the pump to burn. We want to prevent this in the future and we installed solar panels that will provide the pump with power evenly.

.202011 Jalambang01;202011 Jalambang02

 

Work on our Gammol nursery school in Abuko continues. All classrooms are tiled and a veranda must keep the heat out of the classrooms.

.202010 Abuko01;202010 Abuko02

 

In Wassadung, a few kilometers from our previous project in Joreng, we were asked to restore their well. This was a project of the European Development Fund, but it is lacking maintenance and needed to be repaired.

We had to drill a new well and we reused the existing material: a tank of 11,000 L with the necessary connections and the pump. This way the entire village gets clean water again.

20200727 wassadung02

20200727 wassadung01

 

 

Joreng is a village with 2000 inhabitants, 126 km from the capital. The need for clean water in the interior is particularly great. The national water and electricity company does not yet have infrastructure here and water and electricity is not available.

The tower is 7 meters high with a water tank of 3000 L and 7 taps scattered around the village. 

It is the first time that we have placed a well so far inland. Thanks to our own jeep, we can significantly expand our range. You will certainly see us more in this area in the future!

 

20200723 joreng01;20200723 joreng02

20200723 joreng03

 

 

The water supply of our water well in Mamuda has come to a standstill due to a lack of electricity. The solar panels were cleaned, the fastening of the various components checked and now there is water again. Excellent.