We are also installing a new water installation in Tubakuta. As is now customary: a 7-metre tower with 2 water tanks of 5,000 litres, 1,500 metres of pipes and 15 taps. Here Omar and Lamin from Gammol, together with a few villagers, slide the pump into the water well.